Select the first product families
Start with products that fit the target market, commercial demand and available technical capability. Different pastes, powders, gels, liquids and reactive systems may need different rooms, equipment, utilities and controls.
Assess the site and quality capability
Review room layout, material flow, utilities, storage, environmental needs, sampling, testing, batch records and deviation handling. The precise requirements must come from the selected products and applicable local rules.
Connect technology and equipment
A formula or a machine list alone is not a complete transfer. The project should connect raw-material specifications, process stages, equipment parameters, in-process controls, filling, packaging and documentation.
Train the operating team
Define the roles of technologists, operators, quality staff and project management. Practical work and pilot activities should have agreed outcomes and acceptance criteria.
Plan the launch in stages
Use a documented route from assessment and scope definition through facility preparation, training, pilot work and repeat production. Denterr can evaluate technology transfer and local production support for the selected catalogue categories.